Facade and concrete repair.
Spalling concrete, cracked render, failed joints and loose cladding, repaired to construction standards. Recladding scopes delivered as principal or subcontractor.
Find the cause first, then repair it.
Spalling concrete, cracked render and leaking joints are the visible end of a longer problem.
The cause is usually one of four things. Rust reaching the steel inside the concrete. Movement the joint was never built to take. A failed flashing above. Or a coating that was wrong for the wall.
Patch the surface and the same call comes back.
So we look at the wall, work out what failed, and write the repair against it.
If your engineer or facade consultant is already involved, we work to their drawings. If a job needs engineering input we cannot give, we say so.
Repairs we carry out.
Twelve jobs we price, specify and do from the rope. If yours is not here, ring and ask.
How a repair runs.
-
01
We survey the wall
A technician inspects the elevation, maps each defect and photographs it.
-
02
You get the price
What we will do, the materials, the quantities and a price you can compare.
-
03
We do the work
You or your consultant can inspect the prepared surface before we cover it. Daily photos.
-
04
You get the records
Photos, product and batch records, the repaired areas marked up, and the warranty papers.
Quick questions.
What property managers ask before booking repair work. More on the full FAQ page.
Is concrete spalling dangerous?
It can be. Loose concrete can fall, and once the steel inside starts to rust the damage spreads. Have it looked at.
Can the building stay occupied?
Almost always. Ropes do not block doors, footpaths or car parks. We agree working hours and resident notices with the building manager.
Do you work to an engineer's specification?
Yes. That is how most large repairs run. Where no consultant is involved, we survey the building and write the scope ourselves.
How do you price a repair when nobody knows the extent?
We price what the survey confirmed, and set rates for what shows up once the surface is opened. Extra work is agreed in writing first.
Tell us about your building.
Send the address and what you are seeing. We will come and look, then send a clear, itemised quote.


